Peregrine Team is hiring Cleaning Techs for a massive Data Center construction project in Abilene, TX!
Day & Night Shifts available - 40-60 hours per week - Starting pay $19
As a Cleaning Tech, you'll play a pivotal role in ensuring the success execution of cleaning projects from inception to completion. You'll be entrusted with various responsibilities, including learning and understanding Data Center environments.
Job Duties:
- Comfortable in construction environments, using machinery (fork-lifts, scissor lifts, etc.)
- Comfortable with heights and small spaces.
- Follow directions from Supervisor and/or Team Lead
- Clean, chemically treat, and vacuum physical surfaces within a construction, technical or GMP environment.
- Subfloor vacuuming and wiping.
- Drop ceiling vacuuming and wiping.
- Clean outside of cabinets.
- Floor surface vacuuming and mopping (both vinyl and HPL floors).
- Dust furniture, walls, machines, or hardware.
- Clean windows, glass allotments and mirrors utilizing foamy water or different cleaners.
- May assist with monitoring personnel entry and exit points to controlled or sanitized areas to ensure compliance with PPE requirements.
Requirements:
- Ability to read, write and speak English proficiently
- Ability to pass criminal background check
- Ability to pass substance screening
- Must have reliable transportation
- Valid Government-issued ID
- Must have steel-toed (or safety-toed) boots
Preferred:
- Knowledge of Data Centers
- Experience as a Cleaner/Janitor
- OSHA 10/30 Certification
Job Type: Full-time
Pay: From $19.00 per hour
Benefits:
- 401(k)
- Dental insurance
- Health insurance
- Referral program
- Vision insurance
Schedule:
- 10 hour shift
- 8 hour shift
- Day shift
- Monday to Friday
- Night shift
- Overnight shift
- Overtime
- Weekends as needed
Work Location: In person