Consultant - Forensic Delay Analysis

Rimkus
$103,527 - $132,599 a year
Remote
Full time
3 weeks ago

Join Rimkus and unlock your potential with endless opportunities for growth, learning, and making a difference!

Rimkus (www.rimkus.com) is a worldwide leader in Engineering and Technical Consulting. Rimkus experts specialize in building envelope, engineering, forensic consulting, dispute resolution, construction management services, and solutions built for the environment.

NOW IS THE TIME to join this growing and stable company! We offer our full-time employees a competitive salary, bonus opportunities and a full benefits package that includes medical, dental, vision, life, disability, employer-matching 401(k), and opportunities for advancement!

Overview:

As a Consultant within the Delay and Damages group, you will focus on Forensic Delay Analysis and work Subcontractor Default, Surety, Professional Liability, Builders Risk, Delay-In-Startup, Forensic Delay Analysis, Loss of Productivity and other complex construction claims and disputes. Responsibilities will include performing various methods of Forensic Delay Analysis on construction projects and various cost and quantum related analysis on construction claims and disputes for insurance carriers, law firms, owners, developers, and contractors around the world.

ESSENTIAL JOB FUNCTIONS:

  • Performing Forensic Delay Analysis on construction project schedules and producing written forensic reports detailing the findings.
  • Performing contract, change order, cost overruns, and quantum-related analysis on complex construction claims and disputes for insurance carriers, law firms, owners, developers, and contractors and producing written forensic reports detailing the findings.
  • Managing and supporting in the research and analysis of contemporaneous project documentation.
  • Managing multiple projects and coordinating with other support team members to produce client reports in a timely manner.

REQUIRED EXPERIENCE, EDUCATION and CERTIFICATIONS:

  • Bachelor’s degree in engineering, architecture, or construction management.
  • 5-7+ years of experience performing CPM scheduling and cost analysis work.
  • Knowledge of Architecture, Civil, Structural, MEP, Building Enclosure systems and designs for commercial, retail, and high-rise residential buildings.
  • Experience in the analysis of construction claim damages including delay damages.
  • Proficiency in P6® scheduling software, experience with MS Project® and Asta®.
  • Proficiency in 3rd party schedule analysis software.
  • Proficient in Microsoft Office products such as PowerBI, Excel, Word, and PowerPoint.
  • Working knowledge of AutoCAD, Revit, Outlook, Word, and BlueBeam.
  • Experience coordinating with disciplines internally as well as externally with consultants /architects.
  • Experience conducting and attending construction sites, as well as preparing site reports.

Preferred SKILLS and ABILITIES:

  • Testifying experience is a plus for any candidate. If not, we will train and prepare you for this.
  • Experience with estimating software.

PHYSICAL DEMANDS, OVERTIME, and TRAVEL:

Physical Demands :

Work will be performed both in an office setting and at outside locations (i.e., Client’s office, industrial, construction, and/or residential sites). Employee is frequently required to stand, sit, climb ladders, bend, balance, stoop, kneel, crouch, talk, hear, and drive a motor vehicle to job sites. Employee may occasionally lift and/or move up to 50 pounds of equipment. Employee must be attentive, focused, and alert when conducting site inspections, speaking, and interacting with clients, preparing drawings and written reports. Clear vision and depth perception are also necessary.

Overtime - This position is classified as salaried with an exempt FLSA status. Regular working hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, with one hour for lunch. There will be periods where overtime will be required, which the employee will need to comply with to meet the demands of the position.

Travel Requirements - This position requires up to 25% travel. Some out-of-area and overnight travel may be required.

At Rimkus, we value a diverse and inclusive workplace where all employees feel valued and respected. We are committed to creating a work environment that supports and celebrates the unique perspectives and experiences of all employees. If you share our commitment to diversity and inclusivity and are excited about joining a welcoming and supportive team, we encourage you to apply for our open positions.

Rimkus is an EEO/Affirmative Action Employee and will make all employment-related decisions without regard to race, color, religion, sex, sexual orientation, gender identity, genetic information, national origin, disability, or protected veteran status.

THIS JOB DESCRIPTION IS SUBJECT TO CHANGE AND DOES NOT CONSTITUTE A CONTRACT FOR EMPLOYMENT OR A GUARANTEE OF CONTINUED EMPLOYMENT.

#LI-JM1

#LI-REMOTE

Equal Opportunity Employer/Protected Veterans/Individuals with Disabilities
This employer is required to notify all applicants of their rights pursuant to federal employment laws. For further information, please review the Know Your Rights notice from the Department of Labor.

Apply
Other Job Recommendations:

DPS - CLD - Forensic Scientist I-III, Seized Drugs - 6052-6054

Texas Department of Public Safety
Amarillo, Texas
$4,838 - $6,526 a month
Prior to employment must provide documentation from a physician of: 1. Visual acuity, 2. Color vision acuity, 3. Learns how to...
2 weeks ago

Forensic Interviewer I

Children's Legacy Center
Redding, California
$27 - $30 an hour
  • Collaborate closely with the MDT and Children’s Legacy...
  • Participate in team case staffings to offer insights related...
2 weeks ago

DPS - CLD - Forensic Scientist I-VI, Seized Drugs - 6052-6054

Texas Comptroller of Public Accounts
Lubbock County, Texas
$58,056 - $104,940
*** This is a Grant Funded Position *** Only CURRENT DPS employees in the Seized Drugs discipline will qualify for Forensic...
3 weeks ago

Director of Forensic Accounting and Business Valuation

Wegmann Dazet, APC
Jefferson Parish, Louisiana
$124,025 - $159,195 a year
  • Business valuations, provide strategic leadership and...
  • Oversee the development and analysis of financial models,...
2 days ago

Forensic Analyst

Crox
Capitol Planning Region, Connecticut
$38 - $42 an hour
  • Proficiency in basic data recovery and forensic analysis...
  • Experience in recovering and analyzing internet trace...
3 weeks ago

Licensed Behavior Consultant - Cambria County

Merakey
Cambria County, Pennsylvania
$80,000
We are seeking a Licensed Behavior Consultant to join our team supporting the Cambria County, PA area. The Licensed Behavior...
1 week ago

Lactation Consultant

Main Line Health
Delaware County, Pennsylvania
$30 - $47 an hour
As a Lactation Consultant you will be educating and supporting new moms while they are an inpatient and will continue the support...
1 week ago

FT/PT Fitness Consultant

24e Health Clubs
Shelby County, Alabama
$10 - $12 an hour
  • Maintaining and generating clientele internally and...
  • Present a healthy lifestyle and fitness professionalism at...
1 week ago

Behavior Consultant

Merakey
Greensburg, Pennsylvania
Are you looking for an opportunity to advance your career while working with an extraordinary team? At Merakey, we put heart and...
3 weeks ago

Regional Sales Consultant

Frontier Asset Management
Denver, Colorado
$70,000 - $90,000 a year
  • 401(k) with 4% Employer Match and current 4% Discretionary...
  • Supporting the efforts of the firm’s Regional Directors...
3 weeks ago